Metro City Map

Garcia Noblejas station

Madrid · Metro 7

7

Garcia Noblejas is a station in Madrid served by Metro Line 7.

Loading interactive map…

Lines at Garcia Noblejas

7
Metro Line 7
  • Towards Pitis: next stop Ascao
  • Towards Estadio Metropolitano: next stop Simancas

Train times at Garcia Noblejas

DirectionMon–FriSaturdaySunday
7 to Pitisall nightall nightall night
7 to Estadio Metropolitanoall nightall nightall night

First and last departure from this station in the published timetable. Holidays and engineering works can change them.

Travel times from Garcia Noblejas

Times are estimates from distance and typical speeds; check the operator for works and night service.

Frequently asked questions

Which lines stop at Garcia Noblejas?

Metro Line 7.

What is the next station after Garcia Noblejas on Metro Line 7?

Towards Pitis: Ascao. Towards Estadio Metropolitano: Simancas.

What time is the first and last train at Garcia Noblejas?

On weekdays the first Metro Line 7 train to Pitis leaves Garcia Noblejas at 00:08 and the last at 00:00.

How long does it take from Garcia Noblejas to MAD airport?

About 40 minutes by rail with 2 changes, not counting the walk to the platform and the wait.

Data: Consorcio Regional de Transportes de Madrid — Datos abiertos · OpenStreetMap contributors (ODbL) — water areas · OpenStreetMap contributors (ODbL) — track geometry